Save the Dam Mill Pond in Millbrook-Brad Sinclair Flat Rate Realty



Otonabee Conservation is hosting an Open House to present the design of the new Millbrook Dam on January 26th from 4 to 6 PM at the gymnasium of the Cavan Monaghan Township Office.
The Save the Dam Mill Pond Committee encourages you to come out and see the proposed design for reconstructing the dam. As well as the plans for dredging the pond, ensuring a foot bridge and maintaining a waterfall feature.

Costs are expected to be 3.3 Million to rebuild the dam which protects the downtown from major flooding. There is concerns the condition of the current dam would fail if pushed with a large rainfall. 






























Comments

Popular Posts